GPS Tracker Magnetic Real-Time Location & Motion Alerts
€29,99
Get 10% OFF your order with code
Tap the code to copy — apply at checkout
€29,99
€29,99
When valuables go missing, the uncertainty ends
Locate valuables in real time — smartphone GPS updates, instant movement alerts, magnetic attachment without installation, and remote audio monitoring.

Why is this GPS tracker perfect for you?
✔ Real-time location and movement alerts: Get live GPS location updates on a smartphone and receive an alert as soon as a tracked item starts moving. Check the location of a vehicle, bag, or other valuable when needed.
✔ Magnetic attachment, no installation: Attach the tracker to a metal surface in seconds using its magnetic mount. No drilling or installation is required, making it easy to set up and reposition.
✔ Remote audio monitoring: Use the built-in audio monitoring function to listen remotely. The compact ABS tracker also operates from -4°F to 158°F and uses a 3V lithium coin-cell battery.

Specifications
Material: ABS plastic
Dimensions: 1.62 × 0.54 inches
Frequency: 850/900/1800/1900 MHz
Operating temperature and power supply: -4°F to 158°F; 3 V lithium coin-cell battery
Kundenservice
Haben Sie Fragen oder benötigen Sie Hilfe? Unser Team steht Ihnen gerne zur Verfügung.
Wir sind werktags von 09:00 bis 17:00 Uhr (CET) erreichbar.
📧 E-Mail: info@voltyxde.shop
📞 Telefon: +447888395753
Lieferzeit
Aktuell beträgt unsere Bearbeitungszeit 1–5 Werktage, bevor die Bestellung versendet wird. Nach dem Versand dauert die Lieferung in der Regel 1–5 Werktage innerhalb Deutschlands (DHL) sowie in die USA (USPS), abhängig vom Versanddienstleister
Rückgabe
Bei uns haben Sie ein 30-tägiges Rückgaberecht – gültig ab dem Tag, an dem Sie die Ware erhalten. Möchten Sie einen Artikel zurücksenden, kontaktieren Sie uns bitte unter:
📧 E-Mail: info@voltyxde.shop
- Die Auswahl führt zu einem vollständigen Seiten-Refresh.
- Öffnet in einem neuen Fenster.