Cat GPS Tracker Real-Time Location No Subscription Fees
€44,99
Get 10% OFF your order with code
Tap the code to copy — apply at checkout
€44,99
€44,99
Know Where Your Cat Is Without Monthly Fees
Track a cat’s location in real time — smartphone access, precise location data, compact 0.79 × 0.79 in design, no subscription costs.

Why Is This GPS Tracker Perfect for You?
✔ Real-time location updates: Check your cat’s location instantly through a smartphone or another device. Precise, reliable location data helps you keep track of where your cat is.
✔ Compact, cat-friendly design: At just 0.79 × 0.79 in, the compact tracker is designed not to disturb your cat while being worn, making it practical for everyday tracking.
✔ Quick setup, no subscription fees: Attach the tracker quickly and have it ready to use within minutes. Its rechargeable, long-lasting battery and lack of subscription costs make ongoing use straightforward.

Specifications
Material: ABS
Dimensions: 0.79 in × 0.79 in
Battery: Rechargeable long-lasting battery
Location tracking: Real-time location updates via smartphone or another device
Kundenservice
Haben Sie Fragen oder benötigen Sie Hilfe? Unser Team steht Ihnen gerne zur Verfügung.
Wir sind werktags von 09:00 bis 17:00 Uhr (CET) erreichbar.
📧 E-Mail: info@voltyxde.shop
📞 Telefon: +447888395753
Lieferzeit
Aktuell beträgt unsere Bearbeitungszeit 1–5 Werktage, bevor die Bestellung versendet wird. Nach dem Versand dauert die Lieferung in der Regel 1–5 Werktage innerhalb Deutschlands (DHL) sowie in die USA (USPS), abhängig vom Versanddienstleister
Rückgabe
Bei uns haben Sie ein 30-tägiges Rückgaberecht – gültig ab dem Tag, an dem Sie die Ware erhalten. Möchten Sie einen Artikel zurücksenden, kontaktieren Sie uns bitte unter:
📧 E-Mail: info@voltyxde.shop
- Die Auswahl führt zu einem vollständigen Seiten-Refresh.
- Öffnet in einem neuen Fenster.