GPS Tracker Real-Time Location SOS Alerts Water-Resistant

€29,99

In stock and ready to ship

Free shipping in Germany and the USA

30-day return policy

Theme: Black
LIMITED STOCK · Only a few left in stock

This product will be available for sale in 2 weeks, but you can pre-order now to receive 10% discount!

American Express Apple Pay Google Pay PayPal Mastercard Maestro Visa

Get 10% OFF your order with code

VOLT10

Tap the code to copy — apply at checkout

GPS Tracker Real-Time Location SOS Alerts Water-Resistant

€29,99

€29,99

Choose option
Theme: Black
  • Black
  • Blue
  • Green
  • Pink

Stay Close to What Matters, Wherever They Go

Track loved ones in real time indoors and outdoors — GPS, AGPS, LBS and Wi-Fi positioning, SOS alerts, and geofence notifications without constant check-ins.

Why This Tracker Is Perfect for You

✔ Accurate location tracking: GPS, AGPS, LBS and Wi-Fi work together to provide location information indoors and outdoors. View real-time movement on a map through the app.

✔ SOS and geofence alerts: Press the SOS button to send an alert with location details to a smartphone. Set safety zones and receive an automatic notification when the tracker leaves one.

✔ Built for everyday use: The compact, lightweight design is easy to carry, and the IP6567-certified housing handles splashes and rain. The battery lasts up to 96 hours on standby and provides more than 10 hours of active tracking; voice communication is also available through the device.

Specifications

Positioning technologies: GPS, AGPS, LBS and Wi-Fi

Battery life: Up to 96 hours standby; more than 10 hours active tracking

Waterproof rating: IP6567

Functions: SOS alert, geofencing alerts and voice communication

Kundenservice

Haben Sie Fragen oder benötigen Sie Hilfe? Unser Team steht Ihnen gerne zur Verfügung.
Wir sind werktags von 09:00 bis 17:00 Uhr (CET) erreichbar.

📧 E-Mail: info@voltyxde.shop
📞 Telefon: +447888395753

Lieferzeit

Aktuell beträgt unsere Bearbeitungszeit 1–5 Werktage, bevor die Bestellung versendet wird. Nach dem Versand dauert die Lieferung in der Regel 1–5 Werktage innerhalb Deutschlands (DHL) sowie in die USA (USPS), abhängig vom Versanddienstleister

Rückgabe

Bei uns haben Sie ein 30-tägiges Rückgaberecht – gültig ab dem Tag, an dem Sie die Ware erhalten. Möchten Sie einen Artikel zurücksenden, kontaktieren Sie uns bitte unter:

📧 E-Mail: info@voltyxde.shop